Saltar al contenido
Net MeteringProgram
← Volver a la tabla

Salt River Project

Central Arizona, including much of Phoenix, Mesa, Tempe, Chandler, Scottsdale and Gilbert. Not regulated by the Corporation Commission. SRP is a political subdivision with an elected board, which sets its own prices, so nothing the Commission decides about APS applies here.

Tipo
Distrito público de energía
Cuentas
1.1M

Cuánto le acreditan

3.45 cents, set by an elected board

Condiciones publicadas

SRP export price plans credit excess generation at a fixed 3.45 cents per kWh, applied instantly as power leaves the meter rather than netted against what you use later.

Mes a mes
Credited on the bill for the cycle in which the energy was exported.

Condiciones publicadas · verificado el 2026-09-05 · fuente

Requisito de SRPObligatorio

La batería de respaldo es obligatoria
en el territorio de SRP.

SRP no le acredita la energía que usted devuelve a la misma tarifa que le cobra por consumirla.

Eso no hace que la energía solar sea mala idea en el territorio de SRP. Cambia lo que conviene instalar. Cuando lo exportado vale una fracción del precio minorista, el crédito deja de ser el retorno y el objetivo pasa a ser usar más de su propia producción dentro de la casa, lo que suele significar un sistema más grande que el que haría falta con una compañía que paga uno a uno.

El tamaño del sistema es donde se decide esto, así que pregúntelo directamente. Arizona no fija un límite simple en kilovatios: el propio anexo de APS solo exige que el sistema esté en la vivienda, detrás del medidor de facturación y que sirva al consumo del cliente, y cualquier tamaño queda sujeto a los requisitos estatales de interconexión. SRP fija sus propios límites. Pregunte a SRP qué permite antes de dar por hecho que un sistema más grande está descartado.

Entonces la batería cumple dos funciones distintas. Mueve la producción del día hacia la noche para que usted la use en vez de venderla, y mantiene la casa funcionando cuando se cae la red. Esa segunda función no es un extra. Los paneles solos se apagan durante un apagón, por diseño, así que un techo lleno de paneles no alimenta nada durante una tormenta. Esa es la parte que no vamos a pasar por alto.

Por eso lo tratamos como un requisito, no como una mejora opcional. No le referiremos para un sistema de solo paneles en el territorio de SRP, y usted debería desconfiar de cualquiera que le cotice uno sin plantear primero el almacenamiento.

Es nuestra política de referencia, no un requisito legal ni de la compañía eléctrica

Lo que su instalador debería estar diciéndole

SRP is not rate regulated by the Corporation Commission. Its board can change the export rate, and has already voted to retire the Time-of-Use Export plan from the November 2029 billing cycle.

Preguntas sobre la medición neta de SRP

¿Ofrece SRP medición neta uno por uno?
No. SRP export price plans credit excess generation at a fixed 3.45 cents per kWh, applied instantly as power leaves the meter rather than netted against what you use later.
¿Cuánto paga SRP por la energía devuelta a la red?
3.45 cents, set by an elected board. Credited on the bill for the cycle in which the energy was exported.
¿Necesito una batería con SRP?
Sí, y lo tratamos como obligatorio. Como SRP no acredita las exportaciones uno por uno, el retorno tiene que venir de usar su propia producción en vez de venderla, y después del anochecer eso significa almacenamiento y normalmente un sistema más grande que el que haría falta con una compañía que paga uno a uno. La otra mitad es el respaldo: los paneles solos se apagan en un apagón, así que la batería es lo que mantiene la casa funcionando en una tormenta. No referimos sistemas de solo paneles en el territorio de SRP. Esta es nuestra política de referencia, no un requisito legal ni de la compañía eléctrica.
¿Cómo encuentro mi factura de SRP?
Sign in at srpnet.com. Open My Account, then Bill history. Open the latest bill and save the PDF. Or screenshot the summary page. Si no consigue llegar a ella, un cálculo aproximado de su importe mensual promedio basta para empezar.
¿Cuál es la trampa con SRP?
SRP is not rate regulated by the Corporation Commission. Its board can change the export rate, and has already voted to retire the Time-of-Use Export plan from the November 2029 billing cycle.

Instaladores que atienden a clientes de SRP

Elija uno. Solo la empresa que usted elija recibe sus datos, y solo esa empresa le llama.

Estas son empresas reales que operan en el territorio de SRP, ordenadas por reseñas, años de trayectoria y calificación BBB. Ninguna de ellas nos paga por su posición. Elija la que quiera y le llamaremos para organizarlo.

El orden combina tres cosas que leemos de fuentes primarias: el número de reseñas y la calificación de Google, los años de trayectoria tomados del perfil de la empresa en el Better Business Bureau y no de su propia publicidad, y su calificación por letra del BBB. La acreditación del BBB se muestra pero nunca se puntúa, porque es una membresía de pago y no una señal de calidad.

Verifique usted mismo la licencia de cualquier contratista en el registro estatal. Hágalo antes de firmar nada, con cualquier empresa, incluida la nuestra.