Baltimore Gas and Electric medición neta en Maryland

Baltimore and central Maryland, including Howard, Harford, Anne Arundel and Carroll counties. The net metering framework comes from state statute (Public Utilities Article § 7-306), and BGE applies it through its own Rider 18, Net Energy Metering.

Tipo
Compañía privada
Cuentas
1.3M

Cuánto le acreditan

Full retail in kilowatt hours; spring surplus paid at the supply rate

Condiciones publicadas

BGE’s Rider 18 bills you for net energy each month, so a kilowatt hour you send to the grid offsets one you take from it. In a month you send the grid more than you take, you pay the customer charges your rate schedule requires, and the surplus carries forward in kilowatt hours. By default the bank runs to the April billing cycle; what is left is paid within 30 days at the generation or commodity portion of BGE’s rate averaged from the previous May, the supply price rather than retail, or at your supplier’s rate if you buy from one.

Mes a mes
Kilowatt hours carry forward to the April billing cycle, or indefinitely if you elect it in writing or on a form accepted by the Commission.
Una vez al año
Paid within 30 days after the April billing cycle at BGE’s average generation or commodity rate. On a supplier, the average generation or commodity rate of the supplier you were with on 31 March, over the time it served you, if that rate is available; otherwise BGE uses the rate paid by its Standard Offer Service customers as a proxy.

Condiciones publicadas · verificado el 2026-10-08 · fuente

Instaladores que atienden a clientes de BGE

Elija uno. Solo la empresa que usted elija recibe sus datos, y solo esa empresa le llama.

¿No sabe cuál elegir?

Estas son empresas reales que operan en el territorio de BGE. Bold Energy aparece primero porque es la empresa que presentamos primero. Ese orden lo decidimos nosotros y no es una puntuación. Las demás empresas están ordenadas por reseñas, años de trayectoria y calificación BBB. Ninguna de ellas nos paga por su posición. Elija la que quiera y le llamaremos para organizarlo.

El orden combina tres cosas que leemos de fuentes primarias: el número de reseñas y la calificación de Google, los años de trayectoria tomados del perfil de la empresa en el Better Business Bureau y no de su propia publicidad, y su calificación por letra del BBB. La acreditación del BBB se muestra pero nunca se puntúa, porque es una membresía de pago y no una señal de calidad.

Verifique usted mismo la licencia de cualquier contratista en el registro estatal. Hágalo antes de firmar nada, con cualquier empresa, incluida la nuestra.

Cómo se ve esto en una factura de BGE

Un hogar promedio de Maryland, frente a un sistema dimensionado para cubrir su año. El cargo por energía es la parte que baja a cero. El cargo fijo mensual que hay debajo es la parte que nunca baja, y es la cifra que decide si un sistema se paga solo.

Lectura del medidorkWh
Cargo por energía$202.89
$202.89
Ya leímos la tarifa de esta compañía. Lo que le sigue cobrando con cero consumo aparece abajo, junto a la hoja de donde salió. La línea de energía de arriba usa el promedio estatal. Ver lo que le siguen cobrando
DirecciónLeyendo…

La lectura del medidor baja de 41926 a 41667 kilovatios hora. Un mes de 929 kilovatios hora frente a 1,188 kilovatios hora producidos deja 0 kilovatios hora facturados y 259 guardados para el próximo mes, así que el cargo por energía baja de $202.89 a $0.00 a 21.84 centavos por kilovatio hora.

Consumo promedio de un hogar en Maryland, 929 kWh al mes, al precio residencial publicado actual de 21.84¢ por kWh. Su compañía sigue cobrando un cargo fijo mensual que ningún sistema elimina, así que esto es la parte de energía de la factura, que es la parte que desaparece.

Maryland’s full retail rate net metering closes to new customers at the earlier of a 3,000 MW statewide cap or 1 July 2027, under HB 1532. The Public Service Commission’s 2025 report found half the cap already used as of June 2025 and expects the pipeline to exceed it, so the cap may well arrive before the date. Systems connected before then keep the current terms until they are decommissioned, expanded, repowered or re-interconnected. New customers after that go into a successor program the legislature requires to pay less.

Lo que su instalador debería estar diciéndole

If you elect to accrue indefinitely, switching back needs BGE’s approval, which BGE will give if no other request to switch has been made in each twelve-month period from the date of your election; the switch must take place before 1 March to count for that year. The system may not exceed 200 percent of your baseline annual usage; if you do not have twelve months of use, it may be estimated by an agreed method subject to Commission approval. The rider also says residential customers “are required to take service from a standard watt-hour meter to participate”, so ask BGE what that means for your meter before you change rate schedules. Confirm with your utility how much of the 3,000 MW statewide cap remains before you plan around the 1 July 2027 date in HB 1532; the rider is available first come, first served only while the statewide total stays under 3,000 MW.

Las cifras de esta página están citadas de la tarifa de BGE y de resoluciones estatales, publicadas únicamente en inglés. Las mostramos en el original en lugar de traducir una cifra legal y arriesgarnos a alterarla.

Lo que BGE le cobra igualmente

En un mes en que su producción cubre todo lo que consume, el cargo por energía puede llegar a cero. Esto no. Es el mínimo de toda factura, y es la cifra que decide si un sistema se paga solo.

El cargo
$10.00 a month
Cómo se calcula
Schedule R sets the Customer Charge in three annual steps and the current one is Rate Year 3, effective 1 January 2026: $10.00 a month, with a delivery service charge of $0.04859 per kWh on top of what you use. The earlier columns on the same sheet read $9.30 and $9.65 and are 2024 and 2025. Maryland is deregulated, so this is delivery only and generation is billed by whichever supplier you are on.

Schedule R, P.S.C. Md. E-6 (Suppl. 709), Rate Year 3 effective 1 January 2026 · verificado el 2026-09-18 · fuente

Preguntas sobre la medición neta de BGE

¿Ofrece BGE medición neta uno por uno?
Sí. BGE’s Rider 18 bills you for net energy each month, so a kilowatt hour you send to the grid offsets one you take from it. In a month you send the grid more than you take, you pay the customer charges your rate schedule requires, and the surplus carries forward in kilowatt hours. By default the bank runs to the April billing cycle; what is left is paid within 30 days at the generation or commodity portion of BGE’s rate averaged from the previous May, the supply price rather than retail, or at your supplier’s rate if you buy from one. Kilowatt hours carry forward to the April billing cycle, or indefinitely if you elect it in writing or on a form accepted by the Commission.
¿Cuánto paga BGE por la energía devuelta a la red?
Full retail in kilowatt hours; spring surplus paid at the supply rate. Paid within 30 days after the April billing cycle at BGE’s average generation or commodity rate. On a supplier, the average generation or commodity rate of the supplier you were with on 31 March, over the time it served you, if that rate is available; otherwise BGE uses the rate paid by its Standard Offer Service customers as a proxy.
¿Necesito una batería con BGE?
No por las cuentas. BGE acredita las exportaciones a la tarifa minorista, así que la energía que usted envía durante el día le vuelve con el mismo valor después del anochecer sin necesidad de almacenamiento. Una batería sigue mereciendo consideración por los apagones de la temporada de huracanes, pero aquí es una mejora y no un requisito.
¿Cómo encuentro mi factura de BGE?
Sign in at bge.com. Open My Account, then Billing. Open the latest bill and save the PDF. Or screenshot the summary page. Si no consigue llegar a ella, un cálculo aproximado de su importe mensual promedio basta para empezar.
¿Hay alguna fecha límite para los clientes de BGE?
Maryland’s full retail rate net metering closes to new customers at the earlier of a 3,000 MW statewide cap or 1 July 2027, under HB 1532. The Public Service Commission’s 2025 report found half the cap already used as of June 2025 and expects the pipeline to exceed it, so the cap may well arrive before the date. Systems connected before then keep the current terms until they are decommissioned, expanded, repowered or re-interconnected. New customers after that go into a successor program the legislature requires to pay less.
¿Cuál es la trampa con BGE?
If you elect to accrue indefinitely, switching back needs BGE’s approval, which BGE will give if no other request to switch has been made in each twelve-month period from the date of your election; the switch must take place before 1 March to count for that year. The system may not exceed 200 percent of your baseline annual usage; if you do not have twelve months of use, it may be estimated by an agreed method subject to Commission approval. The rider also says residential customers “are required to take service from a standard watt-hour meter to participate”, so ask BGE what that means for your meter before you change rate schedules. Confirm with your utility how much of the 3,000 MW statewide cap remains before you plan around the 1 July 2027 date in HB 1532; the rider is available first come, first served only while the statewide total stays under 3,000 MW.