Knoxville Utilities Board net metering in Tennessee
Knoxville and parts of seven surrounding counties.
- Type
- Municipal
- Accounts
- 210K
What they credit you
Excess sold to TVA at its monthly avoided cost
Published termsKUB sets no export rate of its own. Its Generate Your Own Power page sends customers to TVA’s Dispersed Power Production program to sell excess generation back to TVA, which pays a price it revises monthly to track its avoided cost: 3.112 cents a kWh under the flat Part A for October 2026.
Published terms · checked 2026-10-07 · source
Installers serving KUB customers
Pick one. Only the company you choose receives your details, and only that company calls you.
- LightWave SolarLocal installerBattery20 years tradingBBB A+4.775 GoogleTennessee’s largest residential and commercial solar installer, trading since 2006 with offices in Nashville, Memphis and Johnson City.All of TennesseeSelect this installer
- ReNew Solar SolutionsLocal installerBBB A+, accredited4.981 GoogleNashville installer working in TVA distributor territory across middle Tennessee.All of TennesseeSelect this installer
These are real companies operating in KUB territory, ordered by reviews, years trading and BBB grade. None of them pays us for placement. Pick the one you want and we will call you to arrange it.
Ordering combines three things we read from primary sources: Google review count and rating, years trading taken from the company’s Better Business Bureau profile rather than its own marketing, and its BBB letter grade. BBB accreditation is shown but never scored, because it is a paid membership rather than a mark of quality.
Check any contractor license yourself at the state register. Do that before you sign anything, with any company, including ours.
What this looks like on a KUB bill
An average Tennessee household, against a system sized to cover its year. The energy charge is the part that goes to zero. The fixed monthly charge underneath it is the part that never does, and it is the number that decides whether a system pays for itself.
Meter reading falling from 41926 to 41604 kilowatt hours. A 1,154 kilowatt hour month against 1,476 kilowatt hours produced leaves 0 kilowatt hours billed and 322 banked for next month, so the energy charge falls from $162.37 to $0.00 at 14.07 cents per kilowatt hour.
Tennessee average household use, 1,154 kWh a month, at the current published residential price of 14.07¢ per kWh. Your utility still bills a fixed monthly customer charge that no system offsets, so this is the energy part of the bill, which is the part that goes away.
Battery backup is mandatory
in KUB territory.
KUB does not credit the power you send back at the rate it charges you to take it.
That does not make solar a bad idea in KUB territory. It changes what you should build. When exports are worth a fraction of retail the credit stops being the return, and the job becomes using more of your own production inside the house, which usually means a larger array than a one for one utility would need.
Sizing is where that gets decided, so ask about it directly. Tennessee sets no statutory system size limit, because it has no net metering statute. Size is governed by TVA’s interconnection requirements and by your local power company’s own rules. KUB sets its own limits. Ask KUB what it allows before you accept that a bigger system is off the table.
A battery then does two separate jobs. It moves daytime production into the evening so you use it instead of selling it, and it keeps the house running when the grid goes down. That second job is not a bonus. Panels on their own shut off in an outage, by design, so a roof full of them powers nothing during a storm. That is the part we will not refer around.
So we treat it as a requirement, not an upgrade. We will not refer you for a panels-only system in KUB territory, and you should be skeptical of anyone who quotes you one without raising storage first.
Our referral policy, not a legal or utility requirement
What your installer should be telling you
An interconnection application and agreement with KUB come first, and the TVA contract is separate. The floor is $20.50 a month whatever your roof does.
What KUB bills you anyway
In a month when your production covers everything you use, the energy charge can reach zero. This does not. It is the floor under every bill, and it is the number that decides whether a system pays for itself.
- The charge
- $20.50 a month
- How it is set
- Schedule RS sets a Basic Service Charge of $20.50 a month and states plainly that "the basic service charge constitutes the minimum monthly bill for all customers served under this rate schedule". Energy is 12.050 cents a kilowatt hour in the summer months and 12.009 cents the rest of the year, and unusually those figures already include the purchased power adjustment, currently 1.363 cents, rather than adding it separately. Resolution No. 1493 set the rates from 1 April 2025 and the board approved a further 3 percent increase for April 2026.
Residential Rate Schedule RS, Resolution No. 1493, effective 1 April 2025, with the purchased power adjustment effective 1 January 2026 · checked 2026-09-29 · source
Applying to KUB
What KUB itself requires, as distinct from what the state rule requires. Read from its own published guidelines on the date shown.
- There is no net metering to sign up for
- Tennessee has no net metering statute, and none of the utilities read here credits exports at the retail rate. A quote that promises Tennessee net metering should name the document it comes from.
- What TVA pays changes every month
- TVA buys power under its Dispersed Power Production Guidelines at a price it revises monthly to track its projected avoided cost. Dispersed Power Price Schedule CSPP for October 2026 prints 3.112 cents a kWh under its flat Part A, and 2.913 to 3.221 cents by time of day under Part B.
- Your local power company is the whole question
- Each local power company sets its own interconnection terms and decides what, if anything, it pays. MLGW pays nothing for exports unless you sign TVA’s contract; NES buys exports itself under NESolar Savings.
- You need an interconnection agreement either way
- Every installation requires an interconnection agreement with the local power company, whether or not you are paid anything for exports.
- Green Connect is a contractor program, not a rate
- TVA’s Green Connect connects homeowners with installers in its Quality Contractor Network. It does not pay you for power and it is not net metering.
- Self consumption is the entire return here
- Where an exported kilowatt hour earns about three cents or nothing at all, the value of a system is what you use inside the house. That makes storage and load shifting central rather than optional.
From KUB’s published guidelines · checked 2026-10-07 · source
KUB net metering questions
- Does KUB offer one for one net metering?
- No. KUB sets no export rate of its own. Its Generate Your Own Power page sends customers to TVA’s Dispersed Power Production program to sell excess generation back to TVA, which pays a price it revises monthly to track its avoided cost: 3.112 cents a kWh under the flat Part A for October 2026.
- What does KUB pay for power sent back to the grid?
- Excess sold to TVA at its monthly avoided cost.
- Do I need a battery with KUB?
- Yes, and we treat it as mandatory. Because KUB does not credit exports one for one, the return has to come from using your own production rather than selling it, which after dark means storage and usually a larger array than a one for one utility would need. The other half is backup: panels alone shut off in an outage, so a battery is what keeps the house running in a storm. We do not refer panels-only systems in KUB territory. This is our referral policy, not a legal or utility requirement.
- How do I find my KUB bill?
- Sign in at kub.org. Open My Account, then Billing. Open the latest bill and save the PDF. Or screenshot the summary page. If you cannot get to it, a rough guess at your average monthly amount is enough to start.
- What is the catch with KUB?
- An interconnection application and agreement with KUB come first, and the TVA contract is separate. The floor is $20.50 a month whatever your roof does.