Ale dirèk nan kontni an
← Retounen nan tablo a

Seattle City Light mezi nèt nan Washington

Seattle and several neighboring cities. A municipal utility, covered by Chapter 80.60 RCW like the investor owned companies.

Kalite
Minisipal
Kont
480K

Konbyen yo kredite w

One for one in kWh, zeroed each April

Kondisyon ki pibliye

In a billing period of net use you are billed for the net electricity at your rate. When the system sends more than the house uses, you pay the Base Service Charge and the net excess kilowatt hours are credited on the next bill, one for one.

Mwa pa mwa
Kilowatt hour credits carry from bill to bill through the net metering year.
Yon fwa pa ane
The net metering year begins on 1 April. Credits still in the account at the first scheduled meter reading of the new year are set to zero, with no payment.

Kondisyon ki pibliye · tcheke 2026-10-07 · sous

Enstalatè k ap sèvi kliyan Seattle City Light yo

Chwazi youn. Se sèlman konpayi ou chwazi a ki resevwa enfòmasyon w yo, epi se sèlman konpayi sa a ki rele w.

Ou pa konn kiyès pou chwazi?

Sa yo se vrè konpayi kap travay nan zòn Seattle City Light la. Bold Energy parèt an premye paske se konpayi nou prezante an premye a. Se nou ki chwazi lòd sa a, se pa yon nòt. Lòt konpayi yo klase dapre avi, ane nan biznis ak nòt BBB. Okenn nan yo pa peye nou pou plas yo. Chwazi sa w vle a epi n ap rele w pou nou ranje sa.

Klasman an konbine twa bagay nou li nan sous prensipal: kantite avi ak nòt Google, konbyen ane nan biznis nou pran nan pwofil Better Business Bureau konpayi an olye nan piblisite pa l, ak nòt lèt BBB li a. Nou montre akreditasyon BBB la men nou pa janm bay li pwen, paske se yon manm ou peye pou li, se pa yon mak kalite.

Tcheke lisans nenpòt kontraktè ou menm nan rejis leta a. Fè sa anvan ou siyen anyen, ak nenpòt konpayi, menm ak pa nou an.

Kijan sa parèt sou yon fakti Seattle City Light

Yon kay mwayen nan Washington, kont yon sistèm ki gen gwosè pou kouvri ane a. Frè enèji a se pati ki desann rive zewo. Frè fiks chak mwa anba a se pati ki pa janm desann, epi se chif sa a ki deside si yon sistèm peye pou tèt li.

Lekti kontè akWh
Chaj pou kouran$142.39
$142.39
Nou li tarif konpayi sa a. Sa li toujou fè w peye ak zewo konsomasyon parèt pi ba a, ak fèy tarif kote li soti a. Liy kouran anwo a sèvi ak mwayèn eta a. Gade sa yo toujou fè w peye
DireksyonL ap li…

Lekti kontè a desann soti nan 41926 rive nan 41660 kilowat-è. Yon mwa 955 kilowat-è kont 1,221 kilowat-è pwodui kite 0 kilowat-è faktire ak 266 kenbe pou mwa pwochen, konsa chaj pou kouran an desann soti nan $142.39 rive nan $0.00 nan 14.91 santim pa kilowat-è.

Mwayèn konsomasyon yon kay nan Washington, 955 kWh pa mwa, nan pri rezidansyèl pibliye kounye a ki se 14.91¢ pa kWh. Konpayi ou an toujou chaje yon frè fiks chak mwa okenn sistèm pa retire, konsa sa se pati kouran an nan fakti a, ki se pati ki disparèt la.

Sa enstalatè w la ta dwe ap di w

A system on City Light’s Network System, the downtown grid, may not export electricity at any time. City Light says it has begun planning the next phase of net metering and aims to give at least six months’ notice of any change.

Chif ki sou paj sa a soti nan pwòp tarif Seattle City Light ak nan desizyon leta yo, ki pibliye sèlman an anglè. Nou montre yo jan yo ye olye nou tradui yon chif legal epi riske chanje l.

Sa Seattle City Light fè w peye kanmenm

Nan yon mwa kote pwodiksyon w kouvri tout sa w itilize, chaj enèji a ka rive zewo. Sa a pa rive zewo. Se plafon anba chak fakti, epi se chif ki deside si yon sistèm peye tèt li.

Chaj la
$0.3945 a day, about $12.00 a month inside Seattle
Kijan yo kalkile l
City Light bills a Base Service Charge by the day, “billed regardless of your energy usage”: $0.3945 inside Seattle and in Renton, about $12.00 a month, and between $0.4197 and $0.4262 a day in Burien, SeaTac, Shoreline, Lake Forest Park, Normandy Park, Tukwila and unincorporated King County, about $12.77 to $12.96 a month. Those are the rates in effect since 1 January 2026, and the time-of-use rate introduced in May 2026 carries the same daily charge. The 4% Rate Stabilization Account surcharge that had applied since January 2024 was removed on 1 April 2026. Energy on the flat rate is 13.38 cents a kilowatt hour in Seattle and up to 14.65 cents in the suburban areas. The City Council adopted a further 9.5% increase in each of 2027 and 2028 on 21 July 2026.

Seattle City Light residential rates, flat-rate and time-of-use schedules by jurisdiction, in effect since 1 January 2026 under Seattle Municipal Code Chapter 21.49; Rate Stabilization Account surcharge removed 1 April 2026 · tcheke 2026-10-01 · sous

Kesyon sou mezi nèt Seattle City Light

Èske Seattle City Light ofri mezi nèt youn pou youn?
Wi. In a billing period of net use you are billed for the net electricity at your rate. When the system sends more than the house uses, you pay the Base Service Charge and the net excess kilowatt hours are credited on the next bill, one for one. Kilowatt hour credits carry from bill to bill through the net metering year.
Konbyen Seattle City Light peye pou kouran ou voye tounen nan rezo a?
One for one in kWh, zeroed each April. The net metering year begins on 1 April. Credits still in the account at the first scheduled meter reading of the new year are set to zero, with no payment.
Èske m bezwen yon batri ak Seattle City Light?
Non, pa pou kalkil lajan an. Seattle City Light kredite kouran ou voye a nan to detay la, donk kouran ou voye pandan lajounen an retounen ak menm valè a apre solèy la kouche san ou pa bezwen depo. Yon batri toujou vo lapenn pou koupi kouran pandan sezon siklòn nan, men isit la se yon opsyon anplis, se pa yon egzijans.
Kijan pou m jwenn bòdwo Seattle City Light mwen an?
Sign in at seattle.gov/city-light. Open My Account, then Billing. Open the latest bill and save the PDF. Or screenshot the summary page. Si w pa ka jwenn li, yon estimasyon apeprè sou montan mwayèn ou chak mwa sifi pou kòmanse.
Ki pwoblèm ki gen ak Seattle City Light?
A system on City Light’s Network System, the downtown grid, may not export electricity at any time. City Light says it has begun planning the next phase of net metering and aims to give at least six months’ notice of any change.