Ale dirèk nan kontni an
← Retounen nan tablo a

Orange and Rockland mezi nèt nan New York

Orange, Rockland and Sullivan counties. A Con Edison subsidiary but a separate utility with its own rates and its own CBC.

Kalite
Konpayi prive
Kont
230K

Konbyen yo kredite w

Full retail, locked twenty years, minus a monthly fee

Kondisyon ki pibliye

Residential Phase One net metering credits exports at the full retail rate and holds for twenty years from interconnection. A Customer Benefit Contribution is charged monthly per kilowatt of installed capacity on top.

Mwa pa mwa
Credits carry forward as bill credits.

Kondisyon ki pibliye · tcheke 2026-09-19 · sous

Enstalatè k ap sèvi kliyan O&R yo

Chwazi youn. Se sèlman konpayi ou chwazi a ki resevwa enfòmasyon w yo, epi se sèlman konpayi sa a ki rele w.

Ou pa konn kiyès pou chwazi?

Sa yo se vrè konpayi kap travay nan zòn O&R la. Bold Energy parèt an premye paske se konpayi nou prezante an premye a. Se nou ki chwazi lòd sa a, se pa yon nòt. Lòt konpayi yo klase dapre avi, ane nan biznis ak nòt BBB. Okenn nan yo pa peye nou pou plas yo. Chwazi sa w vle a epi n ap rele w pou nou ranje sa.

Klasman an konbine twa bagay nou li nan sous prensipal: kantite avi ak nòt Google, konbyen ane nan biznis nou pran nan pwofil Better Business Bureau konpayi an olye nan piblisite pa l, ak nòt lèt BBB li a. Nou montre akreditasyon BBB la men nou pa janm bay li pwen, paske se yon manm ou peye pou li, se pa yon mak kalite.

Tcheke lisans nenpòt kontraktè ou menm nan rejis leta a. Fè sa anvan ou siyen anyen, ak nenpòt konpayi, menm ak pa nou an.

Kijan sa parèt sou yon fakti O&R

Yon kay mwayen nan New York, kont yon sistèm ki gen gwosè pou kouvri ane a. Frè enèji a se pati ki desann rive zewo. Frè fiks chak mwa anba a se pati ki pa janm desann, epi se chif sa a ki deside si yon sistèm peye pou tèt li.

Lekti kontè akWh
Chaj pou kouran$168.39
$168.39
Nou li tarif konpayi sa a. Sa li toujou fè w peye ak zewo konsomasyon parèt pi ba a, ak fèy tarif kote li soti a. Liy kouran anwo a sèvi ak mwayèn eta a. Gade sa yo toujou fè w peye
DireksyonL ap li…

Lekti kontè a desann soti nan 41926 rive nan 41767 kilowat-è. Yon mwa 571 kilowat-è kont 730 kilowat-è pwodui kite 0 kilowat-è faktire ak 159 kenbe pou mwa pwochen, konsa chaj pou kouran an desann soti nan $168.39 rive nan $0.00 nan 29.49 santim pa kilowat-è.

Mwayèn konsomasyon yon kay nan New York, 571 kWh pa mwa, nan pri rezidansyèl pibliye kounye a ki se 29.49¢ pa kWh. Konpayi ou an toujou chaje yon frè fiks chak mwa okenn sistèm pa retire, konsa sa se pati kouran an nan fakti a, ki se pati ki disparèt la.

Sa enstalatè w la ta dwe ap di w

This utility charges a Customer Benefit Contribution of $1.00 for every kW DC, every month. On an 8 kW system that is $8.00 a month, about $96 a year, and your credits cannot pay it. On the Value Stack the same system would pay $0.50 per kW DC instead. The rate is reset every January and you do not lock it in at interconnection, so treat this year's figure as the start of a series rather than a fixed cost.

Chif ki sou paj sa a soti nan pwòp tarif O&R ak nan desizyon leta yo, ki pibliye sèlman an anglè. Nou montre yo jan yo ye olye nou tradui yon chif legal epi riske chanje l.

Sa O&R fè w peye kanmenm

Nan yon mwa kote pwodiksyon w kouvri tout sa w itilize, chaj enèji a ka rive zewo. Sa a pa rive zewo. Se plafon anba chak fakti, epi se chif ki deside si yon sistèm peye tèt li.

Chaj la
$22.50 a month plus $1.00 for every kilowatt of panel, and never less than $135.00 in total
Kijan yo kalkile l
Service Classification No. 1 sets a Customer Charge of $22.50 a month in the summer months and the other months alike. The minimum charge leaf then reads “The sum of $22.50 monthly, but not less than $135.00 per contract”, so a customer who closes the account early still owes $135.00. The $23.00 next to it is the standby service rate, and the $29.00 under Service Classification No. 19 is the optional residential time of use rate; neither is the default. On top of that sits a second monthly charge that exists only because you generate, and it is not in this rate schedule: New York’s Customer Benefit Contribution, $1.00 for every kilowatt DC of nameplate, every month — $8.00 a month on an 8 kW array, $96 a year. Two details decide how much that matters. It “cannot be offset by any monetary credits on the Customer-Generator’s account”, so you can net the energy side of the bill to zero and still owe this one in cash. And it is calculated on the generation nameplate alone, so adding a battery does not increase it.

Leaf 264 and Leaf 266, PSC No. 3 Electricity, effective 1 January 2026 · tcheke 2026-09-19 · sous

Kesyon sou mezi nèt O&R

Èske O&R ofri mezi nèt youn pou youn?
Wi. Residential Phase One net metering credits exports at the full retail rate and holds for twenty years from interconnection. A Customer Benefit Contribution is charged monthly per kilowatt of installed capacity on top. Credits carry forward as bill credits.
Konbyen O&R peye pou kouran ou voye tounen nan rezo a?
Full retail, locked twenty years, minus a monthly fee.
Èske m bezwen yon batri ak O&R?
Non, pa pou kalkil lajan an. O&R kredite kouran ou voye a nan to detay la, donk kouran ou voye pandan lajounen an retounen ak menm valè a apre solèy la kouche san ou pa bezwen depo. Yon batri toujou vo lapenn pou koupi kouran pandan sezon siklòn nan, men isit la se yon opsyon anplis, se pa yon egzijans.
Kijan pou m jwenn bòdwo O&R mwen an?
Sign in at oru.com. Open My Account, then Billing. Open the latest bill and save the PDF. Or screenshot the summary page. Si w pa ka jwenn li, yon estimasyon apeprè sou montan mwayèn ou chak mwa sifi pou kòmanse.
Ki pwoblèm ki gen ak O&R?
This utility charges a Customer Benefit Contribution of $1.00 for every kW DC, every month. On an 8 kW system that is $8.00 a month, about $96 a year, and your credits cannot pay it. On the Value Stack the same system would pay $0.50 per kW DC instead. The rate is reset every January and you do not lock it in at interconnection, so treat this year's figure as the start of a series rather than a fixed cost.