Konbyen yo kredite w
2.855 cents, and nothing is netted
Kondisyon ki pibliyeSchedule DG-2 buys every exported kilowatt hour at 2.855 cents and bills every imported one at the ordinary retail rate, with no netting between them. GreyStone’s residential energy runs from 4.60 to 10.58 cents, so power you use yourself is worth up to four times power you export.
Kondisyon ki pibliye · tcheke 2026-09-21 · sous
Enstalatè k ap sèvi kliyan GreyStone yo
Chwazi youn. Se sèlman konpayi ou chwazi a ki resevwa enfòmasyon w yo, epi se sèlman konpayi sa a ki rele w.
- Bold EnergyEnstalatè lokalBatriBBB B+, akredite4.948 GoogleMulti-state installer working from a Texas base and publishing 84 licenses across 31 states, with battery storage, repairs and panel removal alongside new installs.Tout JòjyaChwazi enstalatè sa a
- Creative Solar USAEnstalatè lokalBBB A-, akredite4.291 GoogleKennesaw based installer working across metropolitan Atlanta and north Georgia.Tout JòjyaChwazi enstalatè sa a
- Sunpath SolarEnstalatè lokalBBB A+, akredite5.040 GoogleGeorgia installer based west of Atlanta in Dallas, Paulding County.Tout JòjyaChwazi enstalatè sa a
Sa yo se vrè konpayi kap travay nan zòn GreyStone la. Bold Energy parèt an premye paske se konpayi nou prezante an premye a. Se nou ki chwazi lòd sa a, se pa yon nòt. Lòt konpayi yo klase dapre avi, ane nan biznis ak nòt BBB. Okenn nan yo pa peye nou pou plas yo. Chwazi sa w vle a epi n ap rele w pou nou ranje sa.
Klasman an konbine twa bagay nou li nan sous prensipal: kantite avi ak nòt Google, konbyen ane nan biznis nou pran nan pwofil Better Business Bureau konpayi an olye nan piblisite pa l, ak nòt lèt BBB li a. Nou montre akreditasyon BBB la men nou pa janm bay li pwen, paske se yon manm ou peye pou li, se pa yon mak kalite.
Tcheke lisans nenpòt kontraktè ou menm nan rejis leta a. Fè sa anvan ou siyen anyen, ak nenpòt konpayi, menm ak pa nou an.
Kijan sa parèt sou yon fakti GreyStone
Yon kay mwayen nan Jòjya, kont yon sistèm ki gen gwosè pou kouvri ane a. Frè enèji a se pati ki desann rive zewo. Frè fiks chak mwa anba a se pati ki pa janm desann, epi se chif sa a ki deside si yon sistèm peye pou tèt li.
Lekti kontè a desann soti nan 41926 rive nan 41626 kilowat-è. Yon mwa 1,074 kilowat-è kont 1,374 kilowat-è pwodui kite 0 kilowat-è faktire ak 300 kenbe pou mwa pwochen, konsa chaj pou kouran an desann soti nan $175.71 rive nan $0.00 nan 16.36 santim pa kilowat-è.
Mwayèn konsomasyon yon kay nan Jòjya, 1,074 kWh pa mwa, nan pri rezidansyèl pibliye kounye a ki se 16.36¢ pa kWh. Konpayi ou an toujou chaje yon frè fiks chak mwa okenn sistèm pa retire, konsa sa se pati kouran an nan fakti a, ki se pati ki disparèt la.
Batri sekou a obligatwa
nan zòn GreyStone la.
GreyStone pa kredite kouran ou voye tounen an nan menm to li fè w peye pou pran l lan.
Sa pa vle di enèji solè se yon move lide nan zòn GreyStone. Sa chanje sa ou ta dwe konstwi. Lè sa w voye deyò vo yon fraksyon pri detay la, kredi a sispann se benefis la, epi travay la vin sèvi ak plis nan pwòp pwodiksyon w andedan kay la, sa ki anjeneral vle di yon sistèm pi gwo pase sa yon konpayi ki peye youn pou youn ta mande.
Se nan gwosè sistèm nan sa deside, kidonk mande sou li dirèkteman. Lwa Georgia sou Pwodiksyon Distribye a defini yon sistèm rezidansyèl ki kalifye kòm 10 kW oswa mwens, epi Georgia Power aplike limit sa a sou kapasite ondilè a nan pwen sèvis la. Gen koperativ ki pèmèt plis: Walton EMC fikse limit rezidansyèl li a 50 kW. GreyStone fikse pwòp limit pa l. Mande GreyStone sa li pèmèt anvan ou aksepte ke yon sistèm pi gwo pa posib.
Lè sa a batri a fè de travay diferan. Li deplase pwodiksyon lajounen an nan aswè pou w sèvi avè l olye w vann li, epi li kenbe kay la ap mache lè rezo a tonbe. Dezyèm travay sa a se pa yon bonis. Panno pou kont yo etenn pandan yon pàn, se konsa yo fèt, kidonk yon do kay plen panno pa bay kay la anyen pandan yon tanpèt. Se pati sa a nou pa pral pase sou li.
Se poutèt sa nou konsidere l kòm yon egzijans, se pa yon opsyon anplis. Nou p ap voye w pou yon sistèm ak panèl sèlman nan zòn GreyStone la, epi ou ta dwe mefye w de nenpòt moun ki ba w yon pri san li pa pale de depo enèji anvan.
Se règleman referans pa nou, se pa yon egzijans legal ni yon egzijans konpayi elektrik la
Sa enstalatè w la ta dwe ap di w
The schedule dates from October 2021 and reserves the right to change the rate at any time at the co-op’s sole discretion, so ask GreyStone to confirm the current purchase rate in writing. Ask at the same time for the Facilities Charge and the monthly administrative charge in dollars, because DG-2 allows both and prices neither.
Chif ki sou paj sa a soti nan pwòp tarif GreyStone ak nan desizyon leta yo, ki pibliye sèlman an anglè. Nou montre yo jan yo ye olye nou tradui yon chif legal epi riske chanje l.
Sa GreyStone fè w peye kanmenm
Nan yon mwa kote pwodiksyon w kouvri tout sa w itilize, chaj enèji a ka rive zewo. Sa a pa rive zewo. Se plafon anba chak fakti, epi se chif ki deside si yon sistèm peye tèt li.
- Chaj la
- $25.00 a month
- Kijan yo kalkile l
- Rate 1 Schedule RS sets a Service Charge of $25.00 a month in both seasons, and defines the minimum monthly charge as that service charge plus energy charges, Environmental Compliance Cost Recovery, the Wholesale Power Cost Adjustment, the Wallet Watch Credit, the Demand Side Management Cost Adjustment, and regulatory fees and taxes. Energy is 4.60 cents for the first 500 kWh in either season, then 7.20 and 6.45 cents in winter, or 9.00 and 10.58 cents in summer. These are among the lowest retail rates in the state, which also means solar has less to save you here than almost anywhere else. What the residential schedule does not tell you is that going solar brings a second schedule with it. Schedule DG-2, Distributed Generation Service, says a member with a generating facility “may pay a monthly” facilities charge and a “monthly administrative charge to recover incremental administrative expenses (if any)”, and it puts a dollar figure on neither. The facilities charge is defined as a percentage factor applied to the cost of the interconnection plant, covering operations, maintenance, administration, taxes, depreciation and cost of capital, and the schedule adds that it “may be modified at any time by the Cooperative”. So the real floor for a GreyStone solar member is $25.00 plus an amount only GreyStone can tell you. Get it in writing before you sign. DG-2 does state what you are paid: $0.02855 a kilowatt hour, the cooperative’s estimated average annual avoided cost, and that rate “may be adjusted at any time in the sole discretion of the Cooperative”. Note also the Georgia cap — GreyStone is only obliged to buy from distributed generation first come, first served until the total reaches 0.2 percent of its previous year’s peak demand.
Rate 1 Schedule RS, Residential Service, effective billing rendered 1 June 2021 and still the schedule GreyStone publishes, with the $25.00 confirmed on its live rates page 30 September 2026; solar charges and purchase rate at Schedule DG-2, Distributed Generation Service, effective billing rendered 1 October 2021 · tcheke 2026-09-21 · sous
Kesyon sou mezi nèt GreyStone
- Èske GreyStone ofri mezi nèt youn pou youn?
- Non. Schedule DG-2 buys every exported kilowatt hour at 2.855 cents and bills every imported one at the ordinary retail rate, with no netting between them. GreyStone’s residential energy runs from 4.60 to 10.58 cents, so power you use yourself is worth up to four times power you export.
- Konbyen GreyStone peye pou kouran ou voye tounen nan rezo a?
- 2.855 cents, and nothing is netted.
- Èske m bezwen yon batri ak GreyStone?
- Wi, epi nou konsidere l obligatwa. Paske GreyStone pa kredite kouran ou voye a youn pou youn, benefis la dwe soti nan sèvi ak pwòp pwodiksyon w olye w vann li, epi apre solèy la kouche sa vle di depo enèji ak anjeneral yon sistèm pi gwo pase sa yon konpayi ki peye youn pou youn ta mande. Lòt mwatye a se pwoteksyon: panno pou kont yo etenn pandan yon pàn, kidonk batri a se sa ki kenbe kay la ap mache nan yon tanpèt. Nou pa voye moun pou sistèm ak panèl sèlman nan zòn GreyStone la. Sa se règleman referans pa nou, se pa yon egzijans legal ni yon egzijans konpayi elektrik la.
- Kijan pou m jwenn bòdwo GreyStone mwen an?
- Sign in at greystonepower.com. Open My Account, then Billing. Open the latest bill and save the PDF. Or screenshot the summary page. Si w pa ka jwenn li, yon estimasyon apeprè sou montan mwayèn ou chak mwa sifi pou kòmanse.
- Ki pwoblèm ki gen ak GreyStone?
- The schedule dates from October 2021 and reserves the right to change the rate at any time at the co-op’s sole discretion, so ask GreyStone to confirm the current purchase rate in writing. Ask at the same time for the Facilities Charge and the monthly administrative charge in dollars, because DG-2 allows both and prices neither.